Engineered offsite building systems

Prefab Buildings Shaped Around the Project Brief

Plan commercial, institutional, and site buildings around real occupancy, performance, logistics, and delivery requirements.

Slide 1 of 3

A closer look

From Category to Building

A hotel block, a permanent house, a stacked site headquarters, a villa, and a school. The same planning discipline sits behind all of them.

Where the work goes

Sectors We Plan For

Each sector brings its own regulations, occupancy rules, and performance expectations, and those shape the building long before the finishes are chosen.

  • Construction and infrastructure
  • Mining and energy
  • Education
  • Healthcare
  • Hospitality and tourism
  • Industry and logistics
  • Public and municipal
  • Residential development
Why Stronx

Planned Before It Is Priced

Offsite production shortens the programme. It does not remove the planning, engineering, approvals, and commissioning a building still needs.

01

A scope you can compare

Every proposal states what is included and what is not, so two quotations answer the same question instead of hiding the difference in exclusions.

02

Engineered for your site

Structure, foundations, and anchorage are designed for the wind and seismic actions where the building actually stands, not for a generic case.

03

One point of responsibility

Design, production, transport, installation, and commissioning are coordinated by one team, with the site boundary written down before the order.

Choosing between systems

Which One Fits Your Project?

The honest answer usually comes from three questions: how permanent the building is, how soon it has to work, and whether it will ever move.

  • Prefab Structures10
    Typically used for
    Site camps, offices, schools, hospitals, hotels, dining and sanitary buildings
    Permanence
    Long-term or permanent
    On site in
    Weeks
    Relocation
    Possible when planned
  • Containers11
    Typically used for
    Site offices, welfare, accommodation, storage, kiosks and sanitary blocks
    Permanence
    Temporary to long-term
    On site in
    Days
    Relocation
    Yes, craneable
  • Steel Homes4
    Typically used for
    Permanent houses on one or two levels, design-led residential projects
    Permanence
    Permanent
    On site in
    Months
    Relocation
    No
  • Prefab Homes5
    Typically used for
    Budget-led houses, villas, mass housing schemes and rehousing programmes
    Permanence
    Permanent
    On site in
    Weeks to months
    Relocation
    Limited
  • Cabins8
    Typically used for
    Security, control, ticketing, kiosk and single-position sanitary points
    Permanence
    Temporary or permanent
    On site in
    Days
    Relocation
    Yes, craneable
Before you order

What Buyers Ask First

The questions that decide whether a proposal is comparable, and whether the programme is realistic.

How quickly can a building be ready?

The figures in the comparison table describe how long placing and connecting the building takes once it has been produced. The full programme also covers design approval, the production slot, site preparation, and the approvals that apply at the location. We give both dates in a proposal so the difference is visible before an order.

What does a quotation include, and what sits outside it?

Every proposal names the scope explicitly: the building, its envelope and internal layers, the services included, transport, installation, and commissioning. It also names what belongs to the site, typically foundations, utility connections up to an agreed point, access, and permits. Two quotations can only be compared when both answer the same question.

What has to be ready on site before delivery?

A level, load-bearing base built to the stated foundation basis, access for the delivery vehicle and lifting equipment, and utilities brought to the agreed positions. We confirm the ground conditions, anchorage requirement, and crane positions during design rather than on delivery day, because a unit that cannot reach its position is a programme problem, not a product problem.

Are these permanent buildings?

It depends on the system. Steel homes and prefab homes are designed as permanent buildings. Prefab structures can be either, depending on the brief. Containers and cabins are usually relocatable, and stay relocatable only if the foundation, connections, and anchorage are planned that way from the start.

Can the layout be changed?

Within the limits of the system. Modular and panel systems have fixed dimensional modules, so moving a partition, adding a door, or enlarging an opening may fall on a joint and affect structure, insulation continuity, or a tested fire assembly. We record which dimensions are fixed and which changes need engineering review before manufacture.

Who handles permits and approvals?

Requirements vary by location and by intended use, so we name the responsible party for each approval in writing before an order instead of assuming it. We provide the structural design basis, the fire strategy for the intended occupancy, and the as-built information and certificates the authority or the operator will ask for.

Tell us aboutyour project.

Send the intended use, the site, the occupancy, and the date it needs to be working. We come back with the scope we would price.

Talk it through
Prefer to explain the project on a call?
0850 000 00 00
Send the brief
Drawings, a room schedule, or a short note.
info@example.com

1234 Example Street, Suite 100, 34000 Istanbul, Türkiye

or email us: info@example.com